China Electrical Power Transformer manufacturer

China Manufacturer of Zgs11-500kVA Pre-Installed Box-Type Substation Modular Set of 10kv Outdoor Substation 100kVA

Product Details:
Place of Origin: China
Brand Name: HENGFENGYOU
Certification: ISO IEC CB COC KEMA SNI SABS CCC
Model Number: ZGS
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: 2000-200000/piece
Packaging Details: wooden case
Delivery Time: 30 days
Payment Terms: T/T
Supply Ability: 5000 pieces/year

Detail Information

Model: Yb/Zbw27-12/0.4/F.R Rated Current: 630 (a)
Weight: 4600 (Kg) Housing Protection Grade: IP44
Shock Withstand Voltage: 75 (Kv) Product Certification: CQC/CCC/ISO9001
Material No.: 250kVA

Product Description

China Manufacturer of Zgs11-500kVA Pre-Installed Box-Type Substation Modular Set of 10kv Outdoor Substation 100kVA

ZGS series substation is American type combined substation with function of high voltage control, protect, power transformation and distribution. Usually used in urban and rural power distribution system .The high voltage load switch and high voltage fuse of this product are installed in the oil of the transformer, with the two structure: in same case with the transformer and in different case with transformer. It can be used in high-rise buildings, building in urban and rural areas, residential communities ,high-tech development areas, small and medium size factories, mining areas, oil fields, temporary construction sites, and other premises
 

China Manufacturer of Zgs11-500kVA Pre-Installed Box-Type Substation Modular Set of 10kv Outdoor Substation 100kVA 0

 

Number Item Unit FN12-12Load switch FZN21-12Vacuum load switch
1 Rated voltage KV 10
2 Maximum working voltage KV 12
3 Rated frequency HZ 50
4 Rated current A 630
5 Rated breaking current A 630
6 Rated thermal current (Virtual value) KA/S 20/2 20/4
7 Rated dynamic current KA 50 50
8 Short-circuit current (Peak value) KA 50 50
9 Full-load breaking times times 20 10000
10 Mechanical life times 2000 10000
11 1-min power frequency withstand voltage(phase to earthing) KV 42 42
12 Lightning impulse withstand voltage(phase to earthing) KV 75 75

 

China Manufacturer of Zgs11-500kVA Pre-Installed Box-Type Substation Modular Set of 10kv Outdoor Substation 100kVA 1

Use condition

1. The maximum ambient air temperature shall not exceed 45℃, and the minimum shall not exceed - 45℃;

2. The altitude shall not exceed 1000m. If special customized transformers and low-voltage components are used, the altitude can reach 4000m;

3. It shall be placed in a place with a vertical inclination of no more than 5°and no severe vibration or impact;

4. The air humidity is not more than 90% (+ 25℃);

5. Gas place without conducting dust, explosion hazard, corrosion metal and electrical components;

6. Outdoor wind speed shall not exceed 35m/s.

7. If the above normal use environment conditions are exceeded, the customer can customize it with our company.

 

 

Structure characteristic

1. The box shell is designed according to the actual situation with reference to foreign advanced technology, and it has the characteristics of firmness, heat insulation and ventilation, stable performance, corrosion prevention, dust prevention, waterproof, small animal prevention, beautiful appearance, etc. There are many choices of shell materials, such as steel plate, composite plate, stainless steel plate, cement plate, etc.

2. There are high-voltage switchgear such as xgn15, hxgn17 or kyn28a and other equipment in the high-voltage room for high-voltage incoming line, high-voltage metering and high-voltage outgoing line. The high-voltage side can be arranged with ring network power supply, terminal power supply, dual power supply and other power supply modes, and high-voltage metering elements can also be installed to meet the requirements of high-voltage metering. The main switch is generally load switch or vacuum circuit breaker, with compact and reasonable structure and perfect anti misoperation function.

3. There are low-voltage switchgear such as GGD, GCS or MNS and other equipment in the low-voltage room for low-voltage incoming line, reactive compensation and low-voltage outgoing line. The low-voltage side adopts the panel type or cabinet mounted structure to form the power supply scheme required by the user, which can meet the power distribution, lighting distribution, reactive compensation, electric energy metering and other functions. The main switch generally adopts the universal circuit breaker or the intelligent circuit breaker, which is flexible in installation and simple in operation.

4. The transformer in the transformer room can use the fully sealed oil immersed transformer or dry-type transformer. The oil immersed transformer can be S9, S11, S13 or SH15, and the dry-type transformer can be scb10, scb11, SGB10 or scbh15. According to the actual needs of customers, it can be configured freely, which has the advantages of more selectivity and flexibility.

5. The cover of the box is designed with double-layer structure, and the interlayer is filled with foam plastics, which has good heat insulation function. The transformer room is equipped with anti condensation and automatic temperature control monitoring, heating and cooling devices. A dust-proof device is arranged on the position of the door sheet and the louver outside the side plate.

 

 

 

 

China Manufacturer of Zgs11-500kVA Pre-Installed Box-Type Substation Modular Set of 10kv Outdoor Substation 100kVA 2

WHY CHOOSE US:

1. One-stop supplier globally.
2. More than 10 years professional experiences in electrical appliance industry.
3. We offer professional online technology support for perfecting your electrical solution free.
4. Experienced sales service and suggestion.
5. All the products with accessories under strict quality control and final inspection before shipping.
6. We can assure the powerful competitive price and reliable quality products.
7. Most competitive shipping rate from our own shipping forwarder.
8. Warranty assurance: 24 month
9. Whatever big or small order, we can provide you one-to-one service.

 

FAQ:

Q1: What's delivery time?
A: It usually takes about 10 working days after we get samples or drawings before shipping.(Shorter for small order).
Q2: What's your payment terms?
A: We usually accept all kinds of payment terms .Such as T/T,L/C, Credit Card, Cash, western Union, Alibaba trade assurance, etc.
Q3: What's your warranty terms?
A: We offer 12 months warranty time.
Q4: Do you have the products in stock?
A: Depends on your request, we have standard models in stock. Some special products and large quantiry order will be newly produced according to customers' requirement.
Q5: How does your factory do the quality control?
A: We have QC team to comply with TQM to ensure the quality. Each step is in compliance to the standards. At the same time, we will take photos and shoot video for you if you need.
Every product will be fully assembled and carefully tested before packing and shipping.
Q6:What's your main products?
A:Control Cabinet, HV. and LV distribution switchgear, RMU, Transformer, transformer substation, vacuum circuit breaker, metering box, cable branching box, etc.

 

 

Get in touch with us

Enter Your Message